Work Resumed on Condos at Ferry Landing
- Share via
Watt Industries/San Diego Inc. has resumed construction on The Landing, an $88-million condominium community at the Coronado terminus of the San Diego-Coronado Ferry.
The Landing’s first residential structure was virtually destroyed by fire last November. Framing of the 92-home, four-story building is under way.
The project will ultimately consist of 196 units in three four-level buildings.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.